You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Current »

Design componentTestingGeneralRelevant parametersDesign requirementsPerformance requirementsResponsible EngineerSources
Parachute, lines, deployment bag

Tow test

Drop test

Not tangle, fully inflate

Deployment force

Drogue deployed, main retained by lines

Reliable integration

Deployment forces

Relevant velocities in conjunction with deployment force

  

Claire Buffington

Claire Wichman

 
Piston-cup-diaphragmPiston testing

Break shear pins without deforming structures

Fully separate mission package

Deploy drogue while maintaining main

Shear pin forces

Deployment forces

Structures FEA

 

  

Jiaheng Zhang

(Prem Chintalapudi)

 
Tender descender

Deployment testing

Integration testing

Reliable release

Reliable integration

Does not melt Spectra

Deployment forces 

 

Ellen Lee 
SwivelsInstronNot deform     

Other notes:

Avionics tower drop test

Ground test

Vibration/vacuum testing

  • No labels