You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Current »

Assembly Procedures for the Hermes II Avionics Tower

Materials

Allen Key '.077'

Allen Key 'approx. 1/16' (Marked with tape)

Stanley Allen Key set key 15 (Marked with tape)

Small Flathead screwdriver

Small File

Pink Tape Small Phillips Head

Zip Ties

epoxy 

 

Procedures

  1. Independent Assembly of the Tower 

    1. Put Heat Set inserts in all PLA Parts except the GPS holder (pre-integration)

    2. Attach all electronics to the outer face plates

      1. Screw down all flight electronics to their respective places

        1. Pyxida center

        2. Telemega left

        3. MARSA right

      2. Assemble the switch and secure it into place

        1. Attach the flight hardware electrical leads to the switch

    3. Wire electrical leads to the flight hardware
    4. Attachment of Cameras by securing the holders to the Camera face plates
    5. Attach the battery holders to the two outer face plates

      1. Run the power cables to near the battery holders and fix them down using (TBD)

    6. Epoxy all bolts 

     

    (For reference see picture A)

Notes from last integration:

Standoff to panels

flight computers to panels- wire electrical lead

switch- electrical leads

battery + battery holder attach to panels- Leads to switch

camera- holders- plates

plates- ends

 

 

  • No labels