Ground Testing


Purposes:

  • Provides practice for integration

  • Identifies structural weaknesses in parts (could also suggest too much force being used)

  • Evaluating effectiveness of shear pins (shear pins may need to be reduced if too much force is being used and damaging hardware)

  • Identify leaks in a bay (failure to pressurize)

Materials:

  • Safety glasses and other necessary PPE

  • Two stands (can be made out of PVC)

  • All hardware

  • Long stretch of wire and a battery or wireless control

  • Black powder

  • Soft Goods



Safety Procedures:



Setup:

  • Integrate the rocket by following integration procedures (make sure to install pyrotechnics on field)

  • Use either a long stretch of wire and a battery or wireless control to ignite charges in the correct order (for AltOs setup: https://altusmetrum.org/AltOS/doc/altusmetrum.html)

  • Suggested (take a video of firing)

  • No labels