BTOW Calibration for pp500 data in 2009 STAR run
- pedestals & status tables STATUS= completed, May 2009
- input : L2ped output, new set every day, no BFC
- BTOW status tables for 39 RHIC fills have been determined and uploaded to DB. Summary by Jan
- BTOW Relative Calibration STATUS= in limbo
- absolute gains STATUS= low priority, in progress
- Acceptable solution: assume maxET=60 GeV @ ADC=4076 , eta-dependence =sin(theta)
- status 28 August 2009 : NO confirmation of absolute scale from 2009 data
##*Matt looks at electrons from SL09b production