You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

Tools:
  • Adjustable wrench
  • Mutlimeter
  • Small Screwdriver
Materials:
  • x1 Bottom Polycarbonate (PC) Layer
  • x1 Middle PC Layer
  • x1 Top PC Layer
  • x1 DAQ PC Mount
  • x1 Right Angle 3-pos bracket
  • x6 4-40 screws
  • x6 4-40 nuts
  • x4 1/4-20 threaded rods
  • x8 1/4-20, 7/8" L steel coupling nuts (90268A029, McMaster)
  • x8 1/4-20 steel nuts
  • x1 6-32 screw switch (MissileWorks)
  • 6-32 screws
  • 4-40 M-F standoffs
  • x1 Pyxida antenna w/ cable, lock washer, nuts
  • x1 Telemetrum antenna w/ cable, lock washer, nuts
  • 1x 3D printed Battery holder 
  • 1x Thermal DAQ 
  • 4x M-F/F-F M3 standoffs 
Procedures:
  1. Prepare the following sub- assemblies before dressing:
    1. battery holder square
    2. middle square with DAQ mounted
    3. solder power on screw switch
  2. Run power wires through the top square to bottom square
  3. Mount battery holder square first, pick up power wires
  4. Connect power to battery, mount middle square
  5. Run antenna cable through the middle square
  6. Mount antennae (2) to the top square
  7. Mount top square
  8. Mount screw switch
  9. Add nuts on top plate
  10. Get batteries
  11. Prepare nose cone TCs in tip (if not already made)
  12. Silde on nose cone and bolt in place

 

  • No labels