You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

This Wiki page provides information related to the transport process during the SAP Support Pack 2024 project. Further questions about this process can be directed to Elda Prudden, Transport Coordinator, at eprudden@mit.edu or 617-253-5153.

Key Dates

  • SF2 unavailable - to be upgraded starting Sunday Oct 20 at 5pm until Wednesday Oct 23  EOD

  • SH2 unavailable - to be refreshed and upgraded starting EOD Tuesday Oct 22 at 23:59 until EOD Friday Nov 1

  • This year’s “restricted window” (i.e. when the transport path to PS1 changes and dual testing is required for critical production changes) starts when SF2 goes down on Sunday Oct 20 at 5pm and ends after SP2024 go-live weekend (Dec 6-8)

  • The last normal transport to PS1 (until after Support Pack go-live) is Thursday Oct 24.  This would include any transports that have been tested in non-upgraded SH2 and approved between Thursday Oct 17 and Tuesday Oct 22 for production deployment.

  • After Support Pack go-live, the normal transport to production schedule will resume on Wednesday Dec 11.

SAP Environments During Restricted Window

  1. Upgraded environments - SF3, SF2, SH2

  2. Non-upgraded environments - SH1, PS1 (upgraded on go-live weekend in Dec)

  3. SE1 (non-upgraded)

    1. While the support packs are being applied to SF2, SF2 will not be available for development. If an emergency arises during this period, SE1 will be used for development

    2. If a critical issue is discovered in PS1 that requires the application of an OSS note, SE1 will be used instead of SF3 for the application and testing of that note (production support path for OSS notes is SE1 -> SH1 -> PS1).  Additionally, scrutiny would then be needed to ensure that the OSS note is included in SAP's support pack.

Types of Transports/Changes During Restricted Window

  1. Transports related to SP2024 Project - To be deployed to PS1 on SP2024 go-live weekend in Dec (SP2024 upgrade path is SF2 -> SH2 -> PS1).  These include:
    1. Fixes to issues related to SAP support packs encountered in upgraded environments
    2. Non SP2024-related changes for approved projects/enhancements
  2. 'Critical' transports - Considered 'critical' and requiring dual testing, to be deployed to PS1 before SP2024 go-live (production support path is SF2 -> SH1 -> SE1/PS1). These include:
    1. Fixes to issues encountered in PS1
    2. Changes related to projects/enhancements approved for deployment before SP2024 go-live

Note: for dual testing, the changes will need to be tested in both non-upgraded SH1 and again in upgraded SH2 to ensure expected behavior is found in both environments.


Transport procedures

  1. For transports related to SP2024 Project

Create a ServiceNow ticket as usual (directed to SH2), except for the following SN details:

    1. leave the 'State' as ‘Pending’
    2. add Harry Iliopoulos as a watcher
    3. send an email to Harry (harryi@mit.edu) asking for an approval (Olu Brown obrown@mit.edu as backup).
Upon approval, Harry will then change the SN ticket 'State' to 'Work in progress', along with adding approval notes in the Notes tab. 
R3 Admin (r3-chmgt@mit.edu) will then move the transport(s) to SH2.


2. For 'Critical' transports, which require dual testing

To ensure expected behavior in both non-upgraded SH1 and upgraded SH2, dual testing is needed.  Therefore, a ServiceNow ticket will need to be created and directed to both SH1 and SH2. 

Create a ServiceNow ticket as usual (again, directed to both SH1 and SH2), except for the following SN details:

    1. leave the 'State' as ‘Pending’
    2. add Harry Iliopoulos as a watcher
    3. send an email to Harry (harryi@mit.edu) asking for an approval (Olu Brown obrown@mit.edu as backup).
Upon approval, Harry will then change the SN ticket 'State' to 'Work in progress', along with adding approval notes in the Notes tab. 
R3 Admin (r3-chmgt@mit.edu) will then move the transport(s) to both SH1 and SH2.

Upon successful testing in SH1, follow the usual procedures for deployment to PS1 (FYI, during the restricted window, transports will be staged in SE1 before being imported into PS1).

Upon successful testing in SH2, these transports/changes will be deployed a second time to PS1 on go-live weekend, along with all the other SP2024 Project transports/changes (i.e. to ensure that PS1 is in synch with SH2 by importing the same transports in the same sequence as they were imported into SH2).



Resumption of normal transport cycle

On Monday Dec 9, 2024, SH2 will be opened for normal testing activities. All changes approved on or after Monday Dec 9, 2024 will be considered part of the Wednesday Dec 11, 2024 transport cycle.


Transport Coordinator Instructions:

Transport Coordinator Instructions & Audit Process (requires authorization to access the Tech Services wiki page)


  • No labels