tl;dr
- Discussed rough timeline for the fall, whether a faculty design review would happen for Pyxida 6.1, and reviewed some minor design changes for Pyxida 6.1
Notes:
To Do:
CCB in 3 weeks
No external design review
External design review for the new flight computer, focus on getting faculty,
Software leads
Altium - get a licence.
50 Ohm terminators
Design Review Notes (Pyxida 6.1):
Changes to be made (Shreeyam)
- Change barometer from BMP280 to MS5607
- Change through hole SMA connectors to SMD inline SMA connectors
- Better electrically, more mechanically robust, doesn’t interfere with programmer board
- Fix the buzzer footprint (slight footprint error would prevent it from seating correctly)
- L601 should have value 8.2nH, not 10nH