tl;dr

  • Discussed rough timeline for the fall, whether a faculty design review would happen for Pyxida 6.1, and reviewed some minor design changes for Pyxida 6.1

Notes:

To Do:

CCB in 3 weeks

No external design review

External design review for the new flight computer, focus on getting faculty,

Software leads

Altium - get a licence.

50 Ohm terminators

 

Design Review Notes (Pyxida 6.1):

 

Changes to be made (Shreeyam)

    • Change barometer from BMP280 to MS5607
    • Change through hole SMA connectors to SMD inline SMA connectors
      • Better electrically, more mechanically robust, doesn’t interfere with programmer board
    • Fix the buzzer footprint (slight footprint error would prevent it from seating correctly)
    • L601 should have value 8.2nH, not 10nH