The transport tracking goal is to move as much pending work to production as soon as possible, before the 5:00 pm 10/21/2025 production restricted window (the instructions for how to derive the details for the table below can be found by following the Transport Coordinator Instructions & Audit Process link on previous page in project Wiki).
| Transport status | # of Transports as of mm/dd/yy | # of Transports as of mm/dd/yy | # of Transports as of mm/dd/yy | # of Transports as of mm/dd/yy | Comments |
| SF2 transports not released | |||||
| SF2 Released not in SH2 | |||||
| SF2 Released in SH2 not in PS1 | |||||
| SF3 Mods in SF2 not in SH2 | |||||
| SF3 Mods in SF2 SH2 not in PS1 |
See attached spreadsheets below for details.
SP2024 Final Post Upgrade SH2-to-PS1 Transport List.xlsx
SP2024 SF2-to-SH2 Transport List 20241204.xlsx
SP2024 Open Transports 20241004.xlsx
SP2024 Open Transports 20241011.xlsx
SP2024 Open Transports 20241018.xlsx
SP2024 Open Transports 20241104.xlsx