Meeting Notes - Nov. 6, 2007

Attendees

  • Yakov Ostrovsky
  • Judy Maro
  • Raymond
  • Phil Long
  • Phil Bailey
  • Jim Cain
  • Kirky DeLong

Update

  • Mecahnical upgrades are about 90% complete
  • The electronic have all be rewired and NI aquisition boards have been added
  • Noise issues with the stepper motors have been addressed with shielding
  • Currently, the absorption experiment is not complete - it is being replaced with a small carosel
  • Nuclear engineering students will use the experiments in local mode next spring
  • Unkown if the Junior Physics class will use

Next steps list

  • Email Jim and Phil the labview Vi and sample data sets
  • Upgrade labview version from 8.2 to 8.2.1 - Phil Bailey will provide the patch
  • Camera setups, Phil Long with drop off a test camera to Judy and Yakov - this camera will need an IP address. The best way to play with the camera setup is to use a laptop to connect to the camera and take screen captures of possible camera positions.
  • Check with Reactor systems people to determine if a building firewall exists
  • Work on labview VI to make sure it stops correctly (Raymond)
  • Create iLab wiki pages for the reactor experiments
  • Upload sample educational docs onto wiki - powerpoint descriptions and instructions
  • Have Mark update the visualizations - mostly likily in Jan. 2008

Meeting schedule

  • Establish bi-monthly meetings
  • Next meeting: 11am wednsday Nov. 21st (in the reactor conference room?)