Integrate Piston Cup Assembly
(At least 2 people are required- 1 to be the reader, the other to double check that everything is tightened properly (especially quicklinks!))
Here is a google doc with notes taken from a recent CRIMP: https://docs.google.com/document/d/1EI40-bTyYi3VV6vyncOfYpN7Y_5XslfqOWkSpHebirs/edit
Materials:
DRILLED & TAPPED 1/8 NPT PLUG (has a 1/4-20" hole tapped and threaded in the middle of it)
3x FIREBOLTS (a 1/4-20" bolt with a hole in the middle of it)
TEFLON TAPE
3x E-MATCH
5 MINUTE EPOXY
POPSICLE STICK
BLACK POWDER
BLUE TAPE
2x TENDER DESCENDER BODIES
MAIN PARACHUTE
DEPLOYMENT BAG
PISTON (the small one)
1/8TH NPT ELBOW FITTING (CURRENTLY MISSING)
PAYLOAD BULKHEAD
4x 3/4" CAPHEAD 1/4-28 BOLTS
3/16THS HEX KEY
AVIONICS BAY COUPLER
4x 1/2" 1/4-28 HEXHEAD SCREWS
AVIONICS BULKHEAD
WEBBING
3/8-16TH NUT
DIAPHRAGM (NOTE: THREADS ARE DAMAGED)
3/8-16TH EYE BOLT
LOCTITE
COTTER PIN (CURRENTLY NOT THE RIGHT SPECS)
7x 1000LB QUICKLINKS (pack at least 4 extras)
2x KEVLAR LOOPS
3x 1500LB SWIVELS
CUP
4x 10-32 GRUB SCREWS
3/32 HEX KEY
2000LB KEVLAR LINE
KEVLAR SHEARS (the gray scissors)
2x 880LB QUICKLINKS
DROGUE
AIRFRAME TUBE
12x 1/2" 8-32 SCREWS
FLATHEAD SCREWDRIVER
NOSE CONE
PSEUDO FORWARD CLOSURE
PACK OF 6-32 SHEAR PINS
NEEDLE HEAD PLIERS
Pre-Assembly: Build the Firebolt Jumbo
Make sure you are using safety googles, gloves, and all appropriate PPE.
Take a DRILLED & TAPPED 1/8 NPT PLUG (which has a 1/4-20 hole drilled and tapped through the middle) and thread a FIREBOLT into it using approximately 3 wraps of TEFLON TAPE.
Put two E-MATCHES through the hole in the 1/4-20 bolt and glue with 5 MINUTE EPOXY on the head end of the screw. You will need a POPSICLE STICK.
On the other end of the screw, you may be able to push a small amount of epoxy on, but don't get it in the plug's threads.
Once expoxy is dried, put a preselected amount of BLACK POWDER in a little packet of BLUE TAPE, with the e-match head inside of the packet.
Pre-Assembly: Tender Descender Setup
Take the two TENDER DESCENDER BODIES and put the appropriate amount of black powder in them.
Close the bodies and thread a firebolt into each one, using approximately three wraps of Teflon tape.
Pre-Assembly: Pack the Main Parachute
Take the MAIN PARACHUTE.
Pack the main parachute into the DEPLOYMENT BAG.
Primary Integration Checklist
Make sure that the PISTON rod is fully compressed (retracted).
Integrate the 1/8TH NPT ELBOW FITTING into the piston inlet port that is closest to the blunt end. Use approximately three wraps of Teflon tape. Make sure that the male end of the elbow fitting is pointing downwards.
Screw in the Jumbo Firebolt into the male end of the elbow fitting using approximately three wraps of Teflon tape
Using four 1" HEXHEAD SCREWS, screw in the AVIONICS BULKHEAD to the bottom of the piston. These must be screwed in securely before proceeding!
AVIONICS BAY ASSEMBLY PROCEDURES
(Current link: Hermes II & III Avionics Tower Assembly Procedures // to be updated)Put the AVIONICS BAY COUPLER over the piston. The coupler's switchband should be closer to the side with the Firebolt screwed in.
Screw the PAYLOAD BULKHEAD into the top of the piston using four 3/4" LONG 1/4-28 CAP HEAD BOLTS. You need a 3/16THS HEX KEY. (Do one rotation first, then fully screw in.)
Now it's time to assembly the cup including its contents, including soft goods such as WEBBING and chutes as well as eye nut, cotter pin, tender descenders, and more.
Fully screw a 3/8-16TH NUT (the thinner one) onto the piston. Slide the DIAPHRAGM onto the piston.
Now it's time to integrate the two Tender Descenders.
Attach both Tender Descenders using one of the two KEVLAR LOOPS to the 3/8-16TH EYE BOLT. The Tender Descenders should be in parallel. Consult this page for more information.
Using the second kevlar loop, connect the other ends of the Tender Descenders.
Using a QUICKLINK, make sure to also secure the TD safety wires to the eyebolt.
Check the setup of the Tender Descenders thoroughly. Have somebody else check it, too
.
When routing the e-match wires to the Avionics bay D-sub, leave plenty of slack between the Avionics Bay Bulkhead and the Diaphragm (at least 5"). Feel free to secure with a small amount of blue tape. NOTE: This step will likely end up being changed as we plan to add a terminal block and webbing to pass the wires through.
Screw the eyebolt into the diaphragm and add a 1500 LB SWIVEL to the quicklink that is securing the TD safety wires. Add another QUICKLINK to the end of the swivel.
INSERT INFORMATION ON USING LOCTITE
Put the COTTER PIN in the eye nut.
Off to the side, coil the booster to mission package webbing and stow in several small infinity wraps using minimal tape. The optimal height of each infinity wrap is a little over 1". Leave enough slack on one end (do not wrap) to extend the lines from the diaphragm to the forward closure.
Attach the mission package to booster webbing to the PSEUDO FORWARD CLOSURE with a 1000LB QUICKLINK followed by a 1500LB SWIVEL and then another 1000LB QUICKLINK.
Pack the mission package to booster webbing to the pseudo forward closure.
Place the drogue on top. The drogue should be as close to the separation point as possible.
Coil the main riser and stow in several small infinity wraps using minimal tape. Attach one side to a 1000LB QUICKLINK followed by a 1500LB SWIVEL followed by another 1000LB QUICKLINK and then the main parachute suspension lines
Pass the drogue riser through its own loop to secure to the drogue lines. Attach a QUICKLINK, a SWIVEL, and another QUICKLINK to the end of the drogue riser.
Attach the y-bridle- short end to a QUICKLINK and then bridle of the bag, the longer end to the quicklink attached to the end of the TDs, and the single end to the quicklink + swivel on the end of the drogue
QUICKLINK drogue onto main bag with a SWIVEL on the bridle
Use another QUICKLINK to attach the main bag to the TDs as well.
Attach the other end of the main riser using a 1000LB QUICKLINK to the eye nut.
Slide the riser, followed by the suspension lines, and then the main parachute through the CUP.
"Struggle with clocking" - Jakob
Screw the diaphragm into the CUP with FOUR 10-32 GRUB SCREWS using a 3/32 HEX KEY
Put the AIRFRAME TUBE over this complete assembly.
Screw in six 1/2" 8-32 SCREWS to attach the Airframe to the Avionics Bay.
Put the mission package assembly on the extension coupler and secure with three 6-32 SHEAR PINS. Put a bit of tape over each shear pin.
Attach the NOSE CONE with the right clocking to the other end of the Avionics Bay using six 8-32 SCREWS.
NOTES:
-There was an issue with the strangling of the mainbag lines
-Same hardware would be nice- such as a switch from HEXHEADS to CAPHEADS, so that we just need one tool
-the COTTER PINS are not the right specification- we need to order new ones or decide on another method
-we are missing and need to order the 1/8TH NPT ELBOW FITTING
- we will probably permanently attach the avionics wires, as well as the y-bridle for easier integration