Note to posterity
Page locked April 19, 2019. We actually did a fairly impressive amount of this.
Hermes II
BUILDFinish Hermes II (if not done)
Tests for Hermes II
TESTING Vac and Vibe (MP subsystems AND full-up MP system minus cup and chutes... maybe just vac for the full one)
TESTINGRadio (range and operational)
TESTINGThermal (External AND internal) (!!!)
TESTINGStatic load – MP Tube crush & pull, AV tower pull, NC crush, Motor hydro testing....
TESTINGShock/Drop – Mission package on a stiff string, fully built, drop from a couple feet to simulate shock.
TESTINGLanding
TESTINGFin can dynamic/stiffness testing (Matthew C has some ideas here)
TESTINGHITL/HOOTL
FLIGHT OPSFAA Class III waiver if not done (!!!)
FLIGHT OPSLaunch Ops logistics (give this to GS/LO group)
TESTINGSet up in-lab HITL with queue (Zack H. Josef B.)
Future Development
Staging Development
STAGINGMinimum diameter 3" --> 3" staging
- Develop safety protocol and practices for MD rockets
STAGING6" --> 4" Low altitude staging
- Develop staging mechanism for SS-like geometry
DESIGNQ motor
BUILDCustom NC for Hermes II
Low Priority (Far term tech. dev.)
REQUIREMENTSWrite Requirements for Space Shot (if we finish Hermes II)
DESIGNStage 2 Design