This was a ground test of the Hermes Pathfinder rocket. It occurred on Field A at 3:45 PM on November 10, 2017. It was the first use of the Pyrotechnic Piston to separate the rocket. The piston contained 1g of 4F black powder. The tender descender contained .2g of black powder. The rocket used 3x 6shear pins used were not document but were likely 2x 6-32 nylon shear pins and 1x 4-40 nylon pin. The rocket successfully separated, and the tender descender released the main parachute appropriately. After de-integration it was found that the Avionics Bulkhead was seriously deformed. This prevented the planned flight on November 11, 2017 from occurring.

...