Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Added a picture of test article, info about materials and seams as we constructed it

Materials

Add

Seams

French fell with continuous line construction 

Reinforcement

 V-tabs at disk skirt and band skirt (Witkowski, 2). Mark says v-tabs where on disk skirt and both edges of the band (10).

TODO: line/skirt band/vent band ratios

Seams

  • Seams are ~1/2" wide.
  • Between gores, seams are first basted between overlapping pieces of ripstop nylon and then lapped twice with the polypropylene tape.
  • On the band, the length-wise reinforcements are Seam Type SSau-2
  • On all edges (vent, skirt, band), edges of ripstop are folded over 3/8" and either pinned or basted and then 1/2" tape lapped twice on top

...

Fullness

Vent lines are 10% shorter the Dc of the vent (Mark, 11).

Media

Fullness isImage Added

...

Possible Future Considerations?

  • Inflation pockets
  • Pocket bands
  • Pull down apex
  • Inversion "fence"

...