Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Part
Component Status
Responsible Engineers
Booster CupManufacturing Prep

Diego D. 2024, Christina N. 2024

Sustainer CupManufacturing PrepDiego D. 2024, Christina N. 2024

Design

Requirements:

  1. Shall contain soft goods prior to separation
  2. Shall withstand separation loads
  3. Shall separate from the nose cone/staging cone

...

  1. Cut coupler tube to length on the horizontal bandsaw
  2. Sand faces to level
  3. Cut a piece of supporting material to go inside the cup while machining it
  4. Add holes with radial indexer
  5. Sand interior and exterior until slides smoothly into airframemission package tube