You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

Part
Component Status
Responsible Engineers
Booster CupManufacturing Prep

Diego D. 2024, Christina N. 2024

Sustainer CupManufacturing PrepDiego D. 2024, Christina N. 2024

Design

Requirements:

  1. Shall contain soft goods prior to separation
  2. Shall withstand separation loads
  3. Shall separate from the nose cone/staging cone

Material: Fiberglass coupler tube

Risks: Holes shear during separation (insert link to past issues)

Features:

  • Radial holes for interfacing with the diaphragm

Analysis

N/A

Manufacturing

Operations:

  1. Cut coupler tube to length on the horizontal bandsaw
  2. Sand faces to level
  3. Cut a piece of supporting material to go inside the cup while machining it
  4. Add holes with radial indexer
  5. Sand interior and exterior until slides smoothly into mission package tube
  • No labels