Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Part
Component Status
Responsible Engineers
Booster CupManufacturing Prep

Diego D. 2024, Christina N. 2024

Sustainer CupManufacturing Prep

Diego D. 2024, Christina N. 2024

Design

Requirements:

  1. Shall contain soft goods prior to separation
  2. Shall withstand separation loads
  3. Shall separate from the nose cone/staging cone

...

Risks: Holes shear during separation (insert link to past issues)

Features:

  • Radial holes (12 holes of size 6-32 placed 0.3 in. from top of tube) for interfacing with the diaphragm

...

  1. Cut coupler tube to length on the horizontal bandsaw
    Image Added
  2. Sand faces to level
  3. Cut a piece of supporting material to go inside the cup while machining it
  4. Add holes with radial indexer (Note: 
  5. Sand interior and exterior until slides smoothly into mission package tube