Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Timeline:

  • 1st meeting points:

    • How many avionics towers, what does the deployment look like (probably won't be decided) *Assigned

    • Approximate dimensioning, looking into what the mass would be for these systems assuming Phoenix Avionics systems weights and lengths *Assigned

      • Sustainer:

        • Weight:

        • Length:

      • Booster

        • Weight:

        • Length:

    • *Need an estimate of board size from avionics

  • Issue of the bay turning on in transit:

    • Did the vibration of the system cause the screw to move? If so, we may need better screw switches. This one was highly reviewed by rocketry forum: https://www.csrocketry.com/electronics/missleworks.html

    • *I need someone to come up with the test and give me commercial vibrational testers

  • Incorporating a window for easy access
  • *Calculations for bay sizing
  • packing volume of the lines and prevent potential line entanglement issues.
  • Mathinline
    bodyL=\frac{4V}{\pi D^{2}}
     
  • 𝐿=4𝑉/𝜋𝐷^2
  • LaTeX Math Block
    anchorV = \frac{w_{parachute}}{\rho_{packing}}
    V = \frac{w_{parachute}}{\rho_{packing}}


  • 𝑉=𝑃𝑎𝑟𝑎𝑐ℎ𝑢𝑡𝑒 𝑤𝑒𝑖𝑔ℎ𝑡/𝑃𝑎𝑐𝑘𝑖𝑛𝑔 𝑑𝑒𝑛𝑠𝑖𝑡𝑦

Dual Separation & Dual Deployment

...