Responsible Engineers: Emily Albornoz, Hermanus Jacobs, Jacky Zheng, Cruz Soto
Fall 2023
CAD of sustainer AV bay
Previous Work:
Phoenix: Sustainer - Avionics Bay Structures, Booster - Avionics Bay Structures
Hermes III: November 24, 2019 Shake Test, Hermes III Avionics Tower Force Testing, Hermes 3 Reaction Wheel Proposal, Hermes III Payload Bulkhead
Spring 2023
03/22/2023 - Updates from Concept Design Review
- We need to replace the uneven rods with spacers to maintain uniform distancing
- Replace all polycarbonate with G10 fiberglass
- Now that the piston has been chosen, the top bulkhead will be made out of metal
- All avionics decisions, sizing, and placement will no longer be made by the listed R.E.'s
03/05/2023 - Basic Design and Concept Design
- Finalized the switchband system and list of materials
- Presentation for Concept Design Review here
02/19/2023 - Preliminary Research
- To do:
Screw terminal loose – was this the cause of avionics turning on? → Talk to avionics
Look into reviews of screw switches
https://www.rocketryforum.com/threads/the-avionics-bay-thread-post-your-photos.156649/
Talk to Avionics about required components for upper and lower avionics towers
Calculate space above AV tower needed to store parachute
Look at and dimension Phoenix booster mission package tube
4 components: parachute area for 1st stage, AV bay, parachute area for 2nd, motor
Start CADing slider AV tower
Research extra forces on AV tower from parachutes, potential buckling
Decide...
how many avionics towers, what does the deployment look like
approximate dimensioning, looking into what the mass would be for these systems assuming Phoenix Avionics systems weights and lengths
Need an estimate of board size
Issue of the bay turning on in transit:
Did the vibration of the system cause the screw to move? If so, we may need better screw switches. This one was highly reviewed by rocketry forum: https://www.csrocketry.com/electronics/missleworks.html
*I need someone to come up with the test and give me commercial vibrational testers
- Incorporating a window for easy access
packing volume of the lines and prevent potential line entanglement issues.
- L=\frac{4V}{\pi D^{2}}
- 𝐿=4𝑉/𝜋𝐷^2
Sketch of the dual separation, dual deployment mechanism
- Approximate diagram of the system with avionics system (not a schematic)
- Switchband system:
- *CO2 canister would be in place of a charge well. CO
Other Research
- Pomona Liquid Rocket Lab (pg 117+)
- Reinforced, system has a lot of rasberry pis since its for LP, ours will likely be smaller
- Similar to above switchband
- Nosecone bay kits, do we want or need one for GPS, for the pitot tube?