Note to posterity

Page locked April 19, 2019. We actually did a fairly impressive amount of this.

Hermes II

Status
colourRed
titleBuild
Finish Hermes II (if not done)

Tests for Hermes II 

Status
colourRed
titleTesting
 Vac and Vibe (MP subsystems AND full-up MP system minus cup and chutes... maybe just vac for the full one)

Status
colourGreen
titleTesting
Radio (range and operational)

Status
colourRed
titleTesting
Thermal (External AND internal) (!!!)

Status
colourGreen
titleTesting
Static load – MP Tube crush & pull, AV tower pull, NC crush, Motor hydro testing....

Status
colourGrey
titleTesting
Shock/Drop – Mission package on a stiff string, fully built, drop from a couple feet to simulate shock. 

Status
colourGrey
titleTesting
Landing 

Status
colourGreen
titleTesting
Fin can dynamic/stiffness testing (Matthew C has some ideas here)

Status
colourYellow
titleTesting
HITL/HOOTL

Status
colourGreen
titleFlight Ops
FAA Class III waiver if not done (!!!)

Status
colourGreen
titleFlight Ops
Launch Ops logistics (give this to GS/LO group)

Status
colourGrey
titleTesting
Set up in-lab HITL with queue (Zack H. Josef B.)

Future Development

Staging Development 

Status
colourYellow
titleStaging
Minimum diameter 3" --> 3" staging 

    • Develop safety protocol and practices for MD rockets

Status
colourRed
titleStaging
6" --> 4" Low altitude staging

    • Develop staging mechanism for SS-like geometry

Status
colourRed
titleDesign
Q motor

Status
colourGreen
titleBuild
Custom NC for Hermes II

Low Priority (Far term tech. dev.)

Status
colourGreen
titleRequirements
Write Requirements for Space Shot (if we finish Hermes II)

Status
colourYellow
titleDesign
Stage 2 Design