This page will serve as the site of postflight analysis for Hermes Flight 1.

 

Avionics

Payload

Propulsion

Recovery

Piston Deployment

Firing Force
Comparison with Ground Test

Parachute Drag Coefficients (Effective)

Drogue
Main

Parachute Shock Loads

Drogue
Main

Structures

 

 

Integration

Integration began at roughly 1:30 pm PST and the rocket arrived on the pad at roughly 3:00 pm PST.

Lessons Learned

  • Having a good checklist would have been beneficial, even though we likely wouldn't have been able to integrate the rocket in the amount of time that we were given before the end of the launch window if we had been following a strict checklist.
  • Regular batteries are NOT enough to fire 2 e-matches in parallel. We ran into this problem during the ground test, as well as a previous static fire.