Scope

Overview

This document will analyze the flight of Hermes 1 at Friends of Amateur Rocketry in July of 2018. The document will outline the flight performance of the vehicle, calling specific attention to any deviances. These flight events will be discussed in roughly chronological order, by subsystem. Under-characterized or poorly understood behaviors will be noted for future efforts. A section at the end of this document will discuss lessons learned.

Methodologies

Times are indicated as T+ or T- from the first vertical motion on the rail (liftoff). Times are indexed off of the Telemetrum data.

Time [s]Flight Event
T-3.83

Ignition

T+0.00Liftoff
0.27Tower Cleared
 Pierced Cloud Ceiling
6.75Burnout
43.79Apogee
48.60Drogue Inflation
298.20Main Release
300.5Main Inflation
363.00Touchdown

 

Avionics

Payload

Propulsion

Recovery

Piston Deployment

Firing Force
Comparison with Ground Test

Parachute Velocities

Parachute Drag Coefficients (Effective)

It is not possible to do perfect analysis of the Parachute Drag coefficients because we cannot back out the drag on the mission package and booster sections. However, we can determine the effective coefficients (including the drag on these bodies).

Drogue

We trimmed the data so that it didn't include opening shock loads or main opening. We then performed analysis at two different altitudes (~30k ft, ~20k ft, and ~10k ft) in order to see the difference between different altitudes.

 

Main

Parachute Shock Loads

Drogue
Main

Structures

 

 

Integration

Integration began at roughly 1:30 pm PST and the rocket arrived on the pad at roughly 3:00 pm PST.

Lessons Learned

  • Having a good checklist would have been beneficial, even though we likely wouldn't have been able to integrate the rocket in the amount of time that we were given before the end of the launch window if we had been following a strict checklist.
  • Regular batteries are NOT enough to fire 2 e-matches in parallel. We ran into this problem during the ground test, as well as a previous static fire.

Times are indicated as T+ or T- from the first vertical motion on the rail (liftoff). Times are indexed off of the nadir (aft) facing Mobius camera. The zenith camera timestamps lag by 4.076s. Values are taken from either Pyxida or TeleMetrum data. Most StratoLogger data was unavailable to the author of this document.

 