You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

 

 

1. Prepare Overwrap Materials

High temp vacuum bag

20" x 22"

Low temp vacuum bag

20" x 22"

Breather cloth

14" x 20"

High temp peel ply

14" x 20"

High temp release film

14" x 20"

Butcher paper

14" x 30"

Carbon fiber

14" x 30"


2. Layup Phenolic Tube

  • Systems 3000 epoxy applied to carbon fiber (3)

  • 2-3 team members

  • 3-4 hours

  • Consistent set-up & execution needed




3. Phenolic Tube Cure

  • Cure at room temperature in low-temp vacuum bag for 24-36 hours

  • Oven cure for an additional 12 hours in high-temp vacuum bag

 

4. Attach Fins to Fin Can

 

5. Apply Root Fillet to Fins

 









  • No labels