Overview

This parachute is deployed near apogee to enable a rapid, controlled descent in compliance with section 3.1.1 of the DTEG.

Timeline

TaskDate Completed or Estimated
Drogue DesignCompleted ~1/12/2018
Test Article FabricationCompleted 1/22/2018 - 1/25/2018
Test Article Wind Tunnel TestEst. 2/5/2018
Final drogue fabricationEst. 3-4/2018
Final drogue acceptance testingEst. 4-5/2018

Design and Fabrication Details

       DGB Parameters.xlsx

Disk-Gap-Band Design

Disk-Gap-Band Construction