Overview

Hermes 3 is the third Project Hermes airframe constructed. It is intended to conclude the Hermes program in January of 2020. Changes are being minimized to those necessary to resolve 'observations' during the Hermes Flight 2 launch campaign. To propose an Engineering Change Request use this link.

Changes - linked with DeltaCDRs

Tests Performed

 

Parts Built

Organized by Assembly

  • No labels