Issue 1: Payload Stack hardware not integrated

Status: In progress

Links: https://docs.google.com/document/d/1jJIKnwNkUFrRYtleK54WeFaxmPz2NxEFtkXhqwt5JIQ/edit#

Photos:

 

ItemDescription
DescriptionPayload Stack hardware not integrated. Risk to critical mission data
Where foundRocket Central
Suggested FixBring Payload stack hardware to RC
ImplementationHardware coming with Diane R on 7/4
ItemNameDate/time
Found byAndrew A6/30/2019, 12pm
Assigned toDiane R6/30, 9pm
Completed by  
Verified by  



Issue 3: Camera Buttons not functional for LE Cameras

Status: Cameras confirmed functional. Replacement buttons in-work

Photos:

 

ItemDescription
DescriptionCamera buttons are stuck inside camera shell. Risk to critical mission data
Where foundRocket Team Lab
Suggested Fix3d print replacement buttons
Implementation 
ItemNameDate/time
Found byElena R, Andrew A5/11/2019, 4pm
Assigned toElena R, Juan S, Charlie G6/30, 9pm
Completed by  
Verified by  

Issue 4: LE Hardware not integrated

Status: In progress

Links: https://docs.google.com/document/d/1jJIKnwNkUFrRYtleK54WeFaxmPz2NxEFtkXhqwt5JIQ/edit#

Photos:

 

ItemDescription
DescriptionLE Hardware not integrated (Including LE and shield). Risk to critical mission data
Where foundRocket Central
Suggested FixBring LE hardware to RC
Implementation-- LE Hardware is now in RC (7/2, 8pm)
ItemNameDate/time
Found byAndrew A6/30/2019, 12pm
Assigned toAndrew R6/30, 9pm
Completed by  
Verified by  

Issue 5: Vent Hole clean up

Status: In progress

Photos:

 

ItemDescription
DescriptionVent Holes have some fiberglass shards on the inside of the MP tube. Risk to Avionics hardware and personnel integrating rocket
Where foundRocket Central
Suggested FixUse razor blades to remove shards, Use CA to reinforce holes
Implementation 
ItemNameDate/time
Found byAndrew A6/30/2019, 12pm
Assigned to 6/30, 9pm
Completed by  
Verified by  

Issue 6: Fin can transition clean up

Status: In progress

Links: 

Photos:

 

ItemDescription
DescriptionFin can transition has excess JB weld around the edges. Slight risk to aerodynamics
Where foundRocket Central
Suggested FixClean up with razor blades and acetone
ImplementationRazor blades at RC
ItemNameDate/time
Found byAndrew A6/30/2019, 12pm
Assigned toAndrew A, Shannon C6/30, 9pm
Completed by  
Verified by  

Issue 7: Firefly bodies loose 

Status: In progress

Links: 

Photos:

 

ItemDescription
DescriptionBodies of radial firefly cameras are loose in their enclosures. Risk to loss of mission data due to acceleration/vibration
Where foundRocket Central
Suggested FixSecure cameras to AV bay panels
Implementation 
ItemNameDate/time
Found byAndrew A6/30/2019, 12pm
Assigned toZack H, Max K6/30, 9pm
Completed by  
Verified by  

Issue 8: 2S Lipo  

Status: Completed

Links: 

Photos:

 

ItemDescription
Description2S lipo may be swollen. Risk to electronics fire and loss of mission
Where foundRocket Central
Suggested FixCheck if swollen, replace if swollen
ImplementationDisassembled to check if swollen. Battery not swollen, 3D printed plastic had corners nominally bent during printing.
ItemNameDate/time
Found byAndrew A6/30/2019, 12pm
Assigned toAndrew R7/2, 8pm
Completed byAndrew R7/2, 8:15pm
Verified byAndrew A7/2, 8:20pm

Issue 9: TD Retention (WIP)

Status: In progress

Links: 

Photos:

 

ItemDescription
DescriptionTD Retention
Where foundRocket Central
Suggested Fix 
Implementation 
ItemNameDate/time
Found byShannon C6/30/2019, 12pm
Assigned to 6/30, 9pm
Completed by  
Verified by  

Issue 10: TD pins

Status: In progress

Links: 

Photos:

 

ItemDescription
DescriptionTD pins do not push all the way in
Where foundRocket Central
Suggested FixClean up pins, carefully assemble
Implementation 
ItemNameDate/time
Found byShannon C6/30/2019, 12pm
Assigned to 6/30, 9pm
Completed by  
Verified by  

Issue 11: Nut missing in NC

Status: Needs Verification

Links: 

Photos:

 

ItemDescription
DescriptionNut for NC attachment to NC coupler is missing. Came loose from Proline. Risk to structural failure of NC or coupler
Where foundRocket Central
Suggested FixProline or JB weld new 10-32 nut  
Implementation 
ItemNameDate/time
Found byAndrew A6/30/2019, 12pm
Assigned toAndrew A6/30, 9pm
Completed byAndrew A, Jakob C, Cici M7/3, 9pm
Verified by  

Issue 12: Vent-bag bridle knot

Status: In progress

Links: 

Photos:

 

ItemDescription
DescriptionVent-bag bridle length very short - Risk to main bag reacting shock loads in the event drogue shock breaks load-bearing line.
Where foundRocket Central
Suggested Fix 
Implementation 
ItemNameDate/time
Found byShannon C6/30/2019, 12pm
Assigned toShannon C, Claire B6/30, 9pm
Completed by  
Verified by  

 

Issue 13: Pinprick size holes on DGB

Status: Accept risk

Links: 

Photos:

 

ItemDescription
DescriptionSmall pinprick size holes
Where foundRocket Central
Suggested FixNone, Use at risk
Implementation 
ItemNameDate/time
Found byClaire B7/5, 9:45am
Assigned toJakob C7/5, 9:45am
Completed byClaire B, Jakob C 
Verified byMaggie Z 

Closed Issues

Issue 2.docx

 

 



 

  • No labels

2 Comments

  1. Unknown User (astrocrg@mit.edu)

    Unknown User (elenarom@mit.edu) Unknown User (salazarj@mit.edu) Re: Issue 3,

    Can we use a Camera Breakout Board to start the cameras if we can't free the buttons?

    Re: Issue 8

    We need to standardize what is acceptable in our batteries, especially given what just happened with Hyperloop. Is there a 'Battery Puffiness' spec?

    1. Unknown User (elenarom@mit.edu)

      Possibly, but this would prevent us from turning on the camera from outside the rocket closer to launch, so it would have to be on for a while beforehand. Do you know if we have any of the breakout boards in lab?