Issue 1: Payload Stack hardware not integrated
Status: In progress
Links: https://docs.google.com/document/d/1jJIKnwNkUFrRYtleK54WeFaxmPz2NxEFtkXhqwt5JIQ/edit#
Photos:
Item | Description |
---|---|
Description | Payload Stack hardware not integrated. Risk to critical mission data |
Where found | Rocket Central |
Suggested Fix | Bring Payload stack hardware to RC |
Implementation | Hardware coming with Diane R on 7/4 |
Item | Name | Date/time |
---|---|---|
Found by | Andrew A | 6/30/2019, 12pm |
Assigned to | Diane R | 6/30, 9pm |
Completed by | ||
Verified by |
Issue 3: Camera Buttons not functional for LE Cameras
Status: Cameras confirmed functional. Replacement buttons in-work
Photos:
Item | Description |
---|---|
Description | Camera buttons are stuck inside camera shell. Risk to critical mission data |
Where found | Rocket Team Lab |
Suggested Fix | 3d print replacement buttons |
Implementation |
Item | Name | Date/time |
---|---|---|
Found by | Elena R, Andrew A | 5/11/2019, 4pm |
Assigned to | Elena R, Juan S, Charlie G | 6/30, 9pm |
Completed by | ||
Verified by |
Issue 4: LE Hardware not integrated
Status: In progress
Links: https://docs.google.com/document/d/1jJIKnwNkUFrRYtleK54WeFaxmPz2NxEFtkXhqwt5JIQ/edit#
Photos:
Item | Description |
---|---|
Description | LE Hardware not integrated (Including LE and shield). Risk to critical mission data |
Where found | Rocket Central |
Suggested Fix | Bring LE hardware to RC |
Implementation | -- LE Hardware is now in RC (7/2, 8pm) |
Item | Name | Date/time |
---|---|---|
Found by | Andrew A | 6/30/2019, 12pm |
Assigned to | Andrew R | 6/30, 9pm |
Completed by | ||
Verified by |
Issue 5: Vent Hole clean up
Status: In progress
Photos:
Item | Description |
---|---|
Description | Vent Holes have some fiberglass shards on the inside of the MP tube. Risk to Avionics hardware and personnel integrating rocket |
Where found | Rocket Central |
Suggested Fix | Use razor blades to remove shards, Use CA to reinforce holes |
Implementation |
Item | Name | Date/time |
---|---|---|
Found by | Andrew A | 6/30/2019, 12pm |
Assigned to | 6/30, 9pm | |
Completed by | ||
Verified by |
Issue 6: Fin can transition clean up
Status: In progress
Links:
Photos:
Item | Description |
---|---|
Description | Fin can transition has excess JB weld around the edges. Slight risk to aerodynamics |
Where found | Rocket Central |
Suggested Fix | Clean up with razor blades and acetone |
Implementation | Razor blades at RC |
Item | Name | Date/time |
---|---|---|
Found by | Andrew A | 6/30/2019, 12pm |
Assigned to | Andrew A, Shannon C | 6/30, 9pm |
Completed by | ||
Verified by |
Issue 7: Firefly bodies loose
Status: In progress
Links:
Photos:
Item | Description |
---|---|
Description | Bodies of radial firefly cameras are loose in their enclosures. Risk to loss of mission data due to acceleration/vibration |
Where found | Rocket Central |
Suggested Fix | Secure cameras to AV bay panels |
Implementation |
Item | Name | Date/time |
---|---|---|
Found by | Andrew A | 6/30/2019, 12pm |
Assigned to | Zack H, Max K | 6/30, 9pm |
Completed by | ||
Verified by |
Issue 8: 2S Lipo
Status: Completed
Links:
Photos:
Item | Description |
---|---|
Description | 2S lipo may be swollen. Risk to electronics fire and loss of mission |
Where found | Rocket Central |
Suggested Fix | Check if swollen, replace if swollen |
Implementation | Disassembled to check if swollen. Battery not swollen, 3D printed plastic had corners nominally bent during printing. |
Item | Name | Date/time |
---|---|---|
Found by | Andrew A | 6/30/2019, 12pm |
Assigned to | Andrew R | 7/2, 8pm |
Completed by | Andrew R | 7/2, 8:15pm |
Verified by | Andrew A | 7/2, 8:20pm |
Issue 9: TD Retention (WIP)
Status: In progress
Links:
Photos:
Item | Description |
---|---|
Description | TD Retention |
Where found | Rocket Central |
Suggested Fix | |
Implementation |
Item | Name | Date/time |
---|---|---|
Found by | Shannon C | 6/30/2019, 12pm |
Assigned to | 6/30, 9pm | |
Completed by | ||
Verified by |
Issue 10: TD pins
Status: In progress
Links:
Photos:
Item | Description |
---|---|
Description | TD pins do not push all the way in |
Where found | Rocket Central |
Suggested Fix | Clean up pins, carefully assemble |
Implementation |
Item | Name | Date/time |
---|---|---|
Found by | Shannon C | 6/30/2019, 12pm |
Assigned to | 6/30, 9pm | |
Completed by | ||
Verified by |
Issue 11: Nut missing in NC
Status: Needs Verification
Links:
Photos:
Item | Description |
---|---|
Description | Nut for NC attachment to NC coupler is missing. Came loose from Proline. Risk to structural failure of NC or coupler |
Where found | Rocket Central |
Suggested Fix | Proline or JB weld new 10-32 nut |
Implementation |
Item | Name | Date/time |
---|---|---|
Found by | Andrew A | 6/30/2019, 12pm |
Assigned to | Andrew A | 6/30, 9pm |
Completed by | Andrew A, Jakob C, Cici M | 7/3, 9pm |
Verified by |
Issue 12: Vent-bag bridle knot
Status: In progress
Links:
Photos:
Item | Description |
---|---|
Description | Vent-bag bridle length very short - Risk to main bag reacting shock loads in the event drogue shock breaks load-bearing line. |
Where found | Rocket Central |
Suggested Fix | |
Implementation |
Item | Name | Date/time |
---|---|---|
Found by | Shannon C | 6/30/2019, 12pm |
Assigned to | Shannon C, Claire B | 6/30, 9pm |
Completed by | ||
Verified by |
Issue 13: Pinprick size holes on DGB
Status: Accept risk
Links:
Photos:
Item | Description |
---|---|
Description | Small pinprick size holes |
Where found | Rocket Central |
Suggested Fix | None, Use at risk |
Implementation |
Item | Name | Date/time |
---|---|---|
Found by | Claire B | 7/5, 9:45am |
Assigned to | Jakob C | 7/5, 9:45am |
Completed by | Claire B, Jakob C | |
Verified by | Maggie Z |
Closed Issues
2 Comments
Unknown User (astrocrg@mit.edu)
Unknown User (elenarom@mit.edu) Unknown User (salazarj@mit.edu) Re: Issue 3,
Can we use a Camera Breakout Board to start the cameras if we can't free the buttons?
Re: Issue 8
We need to standardize what is acceptable in our batteries, especially given what just happened with Hyperloop. Is there a 'Battery Puffiness' spec?
Unknown User (elenarom@mit.edu)
Possibly, but this would prevent us from turning on the camera from outside the rocket closer to launch, so it would have to be on for a while beforehand. Do you know if we have any of the breakout boards in lab?