BTOW Calibration for pp500 data in 2009 STAR run

  1. pedestals & status tables STATUS= completed, May 2009
    • input : L2ped output, new set every day, no BFC
    • BTOW status tables for 39 RHIC fills have been determined and uploaded to DB. Summary by Jan

  2. BTOW Relative Calibration STATUS= in limbo
  3. absolute gains STATUS= low priority, in progress
    • Acceptable solution: assume maxET=60 GeV @ ADC=4076 , eta-dependence =sin(theta)
    • status 28 August 2009 : NO confirmation of absolute scale from 2009 data
      ##*Matt looks at electrons from SL09b production
  • No labels