Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Added a section for design

Purpose

The Hermes recovery system follows a dual-separation, dual-deploy architecture. The drogue deployment event is initiated at apogee by a pyrotechnically operated piston. The main parachute is retained via a Tender Descender until approximately 2,000ft. Subsystem and component designs, testing procedures and results, and research is summarized here.

Design

The design considerations associated the Hermes recovery system are summarized in the following pages:

 

Testing

Component Level Testing

...