Responsible Engineers: Emily, Hermanus, Jacky, Cruz
Previous Research:
Phoenix:Sustainer - Avionics Bay Structures, Booster - Avionics Bay Structures
Hermes III: November 24, 2019 Shake Test, Hermes III Avionics Tower Force Testing, Hermes 3 Reaction Wheel Proposal, Hermes III Payload Bulkhead
Timeline:
1st meeting points:
How many avionics towers, what does the deployment look like (probably won't be decided) *Assigned
Approximate dimensioning, looking into what the mass would be for these systems assuming Phoenix Avionics systems weights and lengths *Assigned
Sustainer:
Weight:
Length:
Booster
Weight:
Length:
*Need an estimate of board size from avionics
Dual Separation & Dual Deployment
- Approximate diagram of the system with avionics system (not a schematic)
- Switchband system:
- Pomona Liquid Rocket Lab (pg 117+)
- Reinforced, system has a lot of rasberry pis since its for LP, ours will likely be smaller
- Similar to above switchband