Responsible Engineers: Emily, Hermanus, Jacky, Cruz

Previous Research:

Phoenix:Sustainer - Avionics Bay StructuresBooster - Avionics Bay Structures

Hermes III: November 24, 2019 Shake TestHermes III Avionics Tower Force TestingHermes 3 Reaction Wheel ProposalHermes III Payload Bulkhead

 

 

Timeline:

  • 1st meeting points:

    • How many avionics towers, what does the deployment look like (probably won't be decided) *Assigned

    • Approximate dimensioning, looking into what the mass would be for these systems assuming Phoenix Avionics systems weights and lengths *Assigned

      • Sustainer:

        • Weight:

        • Length:

      • Booster

        • Weight:

        • Length:

    • *Need an estimate of board size from avionics

Dual Separation & Dual Deployment

  • Approximate diagram of the system with avionics system (not a schematic)
  • Switchband system
  • Inside view of the electronics bay showing the altimeters and switches.
  • Pomona Liquid Rocket Lab (pg 117+)
    • Reinforced, system has a lot of rasberry pis since its for LP, ours will likely be smaller
    • Similar to above switchband

 

  • No labels